Sign Submittal Package: What to Include and How to Get Approved

A sign submittal package is the set of forms, drawings and details you give your city (and often your landlord) so they can approve a sign before it is built and installed. A complete package has an application, a site plan, a dimensioned sign drawing, attachment and structural details, and electrical information if the sign lights up. Get those right the first time and approval moves faster. Because every CrispSign order is designed online and built to your specifications, you already have the size, materials and colors the reviewer will ask about.
This guide is for business owners: restaurants, retail shops, medical and professional offices, and startups opening a first location. It shows what reviewers look for, in what order to move, and where packages get sent back.
TL;DR
- A submittal package is what you file to get approval for a sign. It usually means an application, a site plan, building elevations, a dimensioned sign drawing, mounting details and, for lit signs, electrical data.
- Requirements are local. Check your city's sign checklist before design starts, and your landlord's sign criteria if you lease.
- Larger or heavier signs often need engineer-stamped structural drawings.
- Order matters: landlord approval, then zoning or design review, then the building permit, then fabrication and inspection.
- Incomplete files, wrong file formats and missing approvals cause most delays.
Table of Contents
- What a sign submittal package is
- Who needs one
- What goes in the package
- Step by step: from idea to approved package
- What happens after approval
- Why submittals get sent back
- Timing: plan the sign around the permit
- Our perspective
- Ready to order your sign
- FAQ
- Sources
What a sign submittal package is
The phrase covers everything a reviewer needs to decide whether your sign is allowed and safe. Cities word it differently. Some call it a sign permit submittal checklist, others a sign review package. Berkeley, California, for example, publishes a Sign / Awning Submittal Package for signs and awnings in commercial and industrial zones.
The package answers three questions:
- Is it allowed? Does the size, number and location fit the local sign ordinance and zoning?
- Is it safe? Will it stay on the wall or in the ground, and is the wiring up to code?
- Is it what you said? Do the drawings show the real lettering, colors and materials?
A sign permit is the approval you receive. The submittal package is the paperwork that earns it. In many cities the two are separate steps. Lancaster, Pennsylvania, routes sign approvals through Sign Administration, the Sign Commission and, where required, its historic board, and a building permit cannot be issued until those approvals are in hand.
Who needs one
Nearly every permanent exterior sign. Burlingame, California, states that a building permit is required to erect, relocate, reconstruct, alter, repair or replace any sign, and the planning division also reviews size, location and number of signs against its sign chapter.
Some items are lighter. Lancaster lists painted signs, banners, temporary sale or rent signs and projecting signs of no more than 2.5 square feet as exempt from building code requirements, though zoning or commission approval may still apply. Changing only the message on a previously permitted sign is on that list too. Never assume an exemption: confirm with your local planning or building office.
If you lease in a shopping center, you have a second reviewer. One national shopping-center developer's sign criteria ask tenants to submit final sign shop drawings to the landlord within 10 days after lease execution. Landlord-approved drawings are then used for the city permit, and the stricter rule wins when landlord and city differ. A copy of each permit goes to the landlord before installation.

What goes in the package
Every city has its own list, but the same building blocks appear again and again. Here is what a few real checklists ask for.
| Document | What it shows | Example of a city requirement |
|---|---|---|
| Application form | Address, parcel, owner or contractor, sign area, sign copy | Sacramento asks for address, APN, owner or contractor information, license class, frontage, sign area and sign copy |
| Site plan | Where the sign sits on the property, with setbacks | Burlingame wants a scaled, dimensioned site plan with property lines, easements, existing structures and sign locations |
| Building elevations | The storefront with the sign placed on it | Rancho Cucamonga asks for tenant frontage length and exact sign placement |
| Sign elevation | Dimensions, depth, letter style, materials and colors | Same checklist: dimensions, depth, letter style, size, materials and colors |
| Mounting and structural details | How it attaches and what it weighs | Danville requires mounting detail cross-sections |
| Electrical plan | Wiring, transformer location, energy compliance | Danville asks for a wiring diagram, transformer location and Title 24 energy data for illuminated signs |
| Photographs | Existing facade and any sign being replaced | Sacramento asks for photos of proposed building elevations and existing signs to be replaced |
Drawings that reviewers can read
Reviewers check numbers, so your drawings need them. Burlingame asks for scaled elevations showing height from finished grade to the bottom and top of the sign. Berkeley wants building elevations at a minimum scale of 1/8 inch to 1 foot, a site plan with a north arrow, photographs of all affected facades and detailed lettering drawings with color and material samples.
Sheet size and count vary. Danville wants three sets, 11 by 17 inches minimum and 24 by 36 maximum. Berkeley asks for one set of 11 by 17 or larger plus a PDF copy. Lancaster, Pennsylvania, requires three sets of drawings showing dimensions, location, construction, load and anchor details, and sign type.
Structural drawings and engineers
Heavy or tall signs usually need an engineer. San Diego requires structural calculations by a California-registered architect or engineer for, among others, monument signs over 6 feet, wall signs over 70 square feet or 600 pounds, and awning signs over 6 feet. Star, Idaho, wants anchorage plans and calculations signed and stamped by an Idaho-licensed design professional. Lancaster, Pennsylvania, generally requires drawings sealed by a licensed architect or engineer, with listed exceptions.
The thresholds above belong to those cities. Your city may draw the line elsewhere, so read its checklist before you assume a small wall sign is exempt from stamped drawings.
Electrical information for lit signs
Illuminated signs carry extra paperwork. Lancaster Township, Washington, asks for the electrical supply source, branch circuit information and listing information (UL, ETA or CSA) plus signed and sealed electrical and structural detail drawings. In California, Sacramento's checklist adds the Title 24 sign-lighting compliance form. If you plan channel letters or an illuminated cabinet sign, collect these details early.
Monument signs
A freestanding sign adds ground-level detail. Rancho Cucamonga's checklist asks monument sign applicants for landscaping and irrigation around the base and a full base description. Lancaster Township, Washington, wants scaled section views with foundation details for freestanding signs, as shown on its signs checklist.
Step by step: from idea to approved package
1. Collect the rules before you design
Find your city's sign ordinance and its sign permit checklist, usually on the planning or building department page. Note the maximum sign area, height limits, number of signs, illumination rules and any historic district limits. In Lancaster's Historic District, for instance, anchoring must be in mortar joints, not masonry units.
If you lease, ask your landlord for the sign criteria first. Designing a beautiful sign that the landlord rejects is the most avoidable redo there is.
2. Check whether other approvals come first
Many cities want a planning or design review step before the building permit. Star, Idaho, requires Planning and Zoning approval before the Building Department submittal. Berkeley's design review typically takes six weeks, sometimes eight to ten depending on workload. The same logic exists elsewhere: Queensland, Australia, for example, separates planning approval from later works approval, a useful picture of why a design sign-off and a construction permit are two different gates.
Lee County, Florida, adds that other permits may be needed from other governmental entities, such as water management districts or state and federal agencies. Property restrictions may also sit in public records.
3. Fix the sign design and specs
Decide the type, size, lettering, colors, materials and lighting. Calculate sign area the way your ordinance defines it, and measure the storefront frontage the sign sits on. These are the numbers every checklist above asks for.
This is where a clear online design process helps. At CrispSign you build your sign online, see an instant estimate, and keep your design assets saved, so the dimensions and materials you give a reviewer match the sign that gets fabricated.
4. Build the drawing set
Put together the site plan, elevations, sign drawing, mounting details and, if needed, electrical sheets. Use a consistent scale, label every dimension and add the height from grade to the top and bottom of the sign. Photograph the facade and any sign being replaced.
5. Check file format and delivery
Many cities now take plans online. Star, Idaho, requires uploads to its IWORQ portal as landscape PDFs at least 11 by 17 inches with space reserved for City approval stamps. Lee County requires contractors to use its eConnect system, while paper is limited to owner-builders, who submit three collated plan sets in person. Contractors there also need a registered state license or county certificate of competency and current liability and workers' compensation insurance or exemption status.
That licensing point matters if you plan to hang the sign yourself. Some jurisdictions only accept applications from licensed contractors, so confirm who is allowed to apply before you plan a DIY install.

6. Submit, then answer comments
Reviewers often return comments. In Houston, a Sign Administration supervisor routes the submission to a Plan Analyst, and if it is rejected the applicant receives an "Applicant Respond and Resubmit" task to answer comments and upload corrections before resubmitting.
Resubmittal rules can be strict. Star, Idaho, wants the same file name as the original with "-resubmittal" appended, a narrative of every change with dates, and changes bubbled on the plans with a revision number. Calculations go in separate searchable PDFs, and work not covered by the permit is marked "On a Separate Permit."
What happens after approval
Do not start building or installing on a hunch. Berkeley states that signs may not be installed until Design Review is complete and a Building Permit is issued, and building and safety issues the permit only after design review approval.
After the permit, inspections follow. Rochester Hills, Michigan, inspects all sign construction for conformance to approved plans and the Michigan Building Code. Its inspections are scheduled online, requests verified before 3:00 p.m. are scheduled for the next business day, and a re-inspection fee may be charged if work is not ready or items are not corrected.
Typical inspection stages there:
- Wall signs: a final electrical inspection (if applicable), then a final sign inspection checking size, height, message and attachment against the approved plans.
- Monument signs: a footing inspection before concrete is poured, checking footing size, depth, location, setbacks and corner clearance, then electrical and final sign inspections.
If you lease, the landlord's rules continue into installation. The shopping-center criteria cited earlier require signs to be fabricated and installed to national, local, building and electrical codes using UL-approved electrical components, and sign vendors must deliver required insurance to the landlord before work begins.
Why submittals get sent back
The cities' own checklists point to the same trouble spots:
- Missing documents. Sacramento's list includes photos, a lighting compliance form and structural calculations where applicable. Leaving one off can stop the review at intake.
- Drawings without dimensions. Burlingame wants height measured from finished grade, and Rancho Cucamonga wants exact placement and frontage length.
- Wrong format or count. Three sets versus one, 11 by 17 versus 24 by 36, paper versus portal: each city differs.
- Skipped approvals. Going to the building department before planning or landlord sign-off is a common reason to be turned back.
- Missing electrical or structural detail. Lit signs and heavy signs need engineered information.
- Messy revisions. Resubmittals that do not follow the city's naming and change-tracking rules slow the next round.
A short pre-submittal checklist keeps you clear of most of these: ordinance read, landlord criteria in hand, scale and dimensions on every sheet, electrical and structural sheets included where required, file format matched to the portal, and fees ready.
Timing: plan the sign around the permit
Berkeley's six-to-ten-week design review shows why timelines matter. Work backward from your opening date. Allow time for landlord review, city review, comments and resubmittal, then fabrication, shipping, installation and inspection. If the sign is the last item on a new restaurant or office build-out, a delay in approval can leave your storefront bare on opening day.
A faster production step helps at the end of that chain. CrispSign's workflow is built for fast turnaround, so once your approval is in, fabrication does not add weeks of its own.
Our perspective
We built CrispSign because ordering a storefront sign should not feel like guesswork. Most owners tell us the same thing in different words: they know what they want the sign to say, but not what a reviewer needs to see.
Our answer is to start from a clear, specific design. When you design online, you settle size, materials, colors and lighting up front, and you can see an instant estimate before you commit. Those are the same facts every city checklist and landlord criteria sheet asks for, so you are not rebuilding your sign details from scratch for the permit.
Our signs are fabricated to spec with professional-grade production, then shipped nationwide. You can install a sign yourself where local rules allow, or we can coordinate a professional installer for a flat fee that is passed on to a third-party installer. Approval stays with your city and landlord, so keep that gate at the front of your plan.
If you manage several locations, our free portal helps you keep signage organized across them.
Nick
Ready to order your sign
Once you know your city's requirements, the next move is a sign that matches them. Choose exterior BeaconLetters, BeaconCarved, BeaconYard or BeaconFlag for the storefront, or LobbyLogo, LobbyPanel, LobbyVinyl and LobbyTents for the interior. Vehicle decals and magnets cover your fleet. Our listed fees include a $99 one-off Artwork setup and a $25 one-off Designer fee, both on the lobby builder page, and a $299 one-off CrispVIP fee, listed on our home page.
Design online, get an instant estimate and have your sign built to your specifications.
FAQ
Is a sign submittal package the same as a sign permit?
No. The package is the set of documents you file, and the permit is the approval you receive. Many cities also add steps such as planning or design review, so a building permit may only be issued after those approvals are obtained, as in Lancaster, Pennsylvania.
Do I need an engineer's stamp?
Sometimes. It depends on sign type, size and weight, and on your city. San Diego, for example, requires structural calculations by a registered architect or engineer for wall signs over 70 square feet or 600 pounds. Check your own city's checklist or ask the building department.
How long does approval take?
It varies by city and workload. Berkeley states a typical minimum processing time of six weeks for design review, sometimes eight to ten. Ask your local office for its current timeline and add landlord review if you lease.
Can I install the sign myself?
Often, but check who may apply for the permit. Lee County, Florida, limits paper applications to owner-builders and requires contractors to hold a registered state license or county certificate of competency. We offer DIY installation or coordinated professional installation.
What if the city asks for changes?
You answer the comments and resubmit. Follow the city's naming and revision rules, as in Houston's respond-and-resubmit process, and mark every change clearly so the reviewer can find it.
Sources
- Lancaster, PA: Sign Permit Submittal Guide
- Sacramento: Sign Permit Submittal Checklist
- San Diego: How to Obtain a Permit for Signs
- Rancho Cucamonga: Sign Permit Checklist
- Lancaster Township, WA: Signs Application Checklist
- Berkeley: Sign / Awning Submittal Package
- Lee County: Sign Application and Permitting Guide
- Houston: Sign Administration Plan Review
- Rochester Hills: Sign Construction guide
- Shopping center sign criteria, Exhibit B
- Planning approval before works approval